(+84) 909 665 775
kathy@vtlc.vn
5 March, 2025

Transportation of a Shipment of Collecting Electrode for SULUT-1 Coal-Fired Steam Power Plant

Transportation of a Shipment of Collecting Electrode for SULUT-1 Coal-Fired Steam Power Plant


Transportation of a Shipment of Collecting Electrode for SULUT-1 Coal-Fired Steam Power Plant
 

Project Information:

  • Project name: SULUT-1 Coal Fired Steam Power Plant (2x50MW)
  • Commodity: Collecting Electrode for Electrostatic Precipitator
  • Volume: 8×40’ platform: 14.9mL x 1.88mW x 2.73mH x 11,612 KGS/Container
  • Port of Loading (POL): Busan Port, Korea
  • Port of Discharge (POD): Surabaya Port, Indonesia
  • Time of Shipment (TOS): 11/2023

 

Transportation of a Shipment of Collecting Electrode for SULUT-1 Coal-Fired Steam Power Plant
 
Vantage Logistics’s scope of work: International shipping freight from Busan, Korea to Surabaya, Indonesia.
 
Transportation of a Shipment of Collecting Electrode for SULUT-1 Coal-Fired Steam Power Plant

Transportation of a Shipment of Collecting Electrode for SULUT-1 Coal-Fired Steam Power Plant
 
Multinational connections: Vantage Logistics has established and maintained effective cooperation with relevant parties in Korea and Indonesia, ensuring that every step from preparation to delivery take place smoothly.
 
Transportation of a Shipment of Collecting Electrode for SULUT-1 Coal-Fired Steam Power Plant
 
Transportation of a Shipment of Collecting Electrode for SULUT-1 Coal-Fired Steam Power Plant
Diverse transportation solutions: Vantage Logistics provided many transportation options for customers can choose the most optimal option in terms of cost, ensuring goods safety and on-time delivery as committed.
 
Transportation of a Shipment of Collecting Electrode for SULUT-1 Coal-Fired Steam Power Plant

Leave a comment